SUPERYACHTROLES.COMJoin
Destinations / North America / Mexico / Puerto Vallarta / Berths
Yachts stern-to at Marina Vallarta, Puerto Vallarta
For captains

Berths in Puerto Vallarta

Marina Vallarta and Paradise Village Marina, with the Mexican import and entry rules for pleasure boats.

Picture made with AI. It shows the place but is not a photograph.

Marinas

Marinas around Puerto Vallarta

MarinaBerthsMaximum lengthDraftContact
Marina Vallarta, Puerto Vallarta354 slips160 ft on the home page; rates priced up to 200 ftNot stated(322) 221-0275, VHF 18 and 16
Paradise Village Marina, Nuevo Vallarta23 mega yacht slips, including a 240 ft end tie240 ft end tieNot stated(+52) 322 226 6728

Marina Vallarta site, copyright 2020; its rates page says more than 354 slips. Paradise Village mega yacht page, copyright 2019, lists 480 V 100 amp power on 8 slips. A July 2026 press report gives Marina Vallarta capacity of about 500 boats. Ask the marina for current figures.

Services

Services at Marina Vallarta

Marina VallartaThe marina lists power and water, Wi-Fi, shower facilities, a pool pass, a launch ramp and pump out services on its rates page.
RatesThe rates page lists prices in pesos per foot per day plus VAT, with no date. Ask the marina for current rates.
Rules

Import permit and entry

Import

Temporary import permit

10 years

ANAM lists a temporary import permit for boats over 4.5 m, valid 10 years with multiple entries and exits. The cost is USD 45 plus IVA online and USD 51 plus IVA at CIITEV modules and consulates. The permit needs proof of ownership or a charter or lease contract with owner authorisation.

Owner not aboard

Marina holds the documents

The ANAM FAQ says that if the owner is not aboard, the marina must hold the import documents. The imported boat cannot be sold or transferred (Customs Law, Article 105).

From 2025

New requirements

From 1 January 2025 a foreign-resident importer must present a statement from a Mexican resident who accepts joint liability for tax debts. Return needs a foreign port authority document. ANAM cites Rule 4.2.11 of the 2025 General Foreign Trade Rules.

News

Dock works in 2026

July 2026

Docks I, J and K

Tribuna de la Bahia reported on 10 July 2026 that rehabilitation of docks I, J and K had started, beginning with removal of old floats on dock J. The paper gives no completion date.

Sources. Checked 8 November 2026.

Let the yachts come to you

Upload your CV and we build your crew profile from it. Captains and recruiters contact you. Free for crew.

Create your crew profile
Free email alerts

Be the first to know.

New superyacht jobs, employers and talent, straight to you as they go live. Stay in the loop.

Get the inside track →